Crib Point Jetty - Port of Hastings (2010). This was built in 1966 for $7m and included a two-berth marine terminal with capacity for tankers up to 100,000 tons - Tyabb Airport photo gallery at Panoramio

View single page Photo gallery Tyabb Airport
View original picture (new window)
Muzza from McCrae, 27 August 2010
 

Photo gallery

Australia, Canberra, ACT